Business | Least-improved

Efficiency eludes the construction industry

American builders’ productivity has plunged by half since the late 1960s

|BERLIN, LONDON AND MALMO

NINE years ago the first concrete was poured for Berlin Brandenburg airport. It was expected to open in 2012, to cost €1.2bn ($1.8bn) and to welcome 34m passengers each year. Today the only people in its terminals are those with hard hats. Six times over budget, the project has had 66,500 building errors in need of fixing. Last year its spokesman was sacked after calling the project a “shit-show” and saying no manager who was not “addicted to pills” could guarantee an opening date.

This article appeared in the Business section of the print edition under the headline “Least improved”

Donald Trump has no grasp of what it means to be president

From the August 19th 2017 edition

Discover stories from this section and more in the list of contents

Explore the edition

Discover more

Food packaging with "Notpla Coating" is pictured at Notpla.

Could seaweed replace plastic packaging?

Companies are experimenting with new ways to reduce plastic waste

A sequoiq tree with a metal detector scanning around the Silicon valley and California.

Has Sequoia Capital outgrown its business model?

Venture capital’s hardiest perennial gets back to its roots


A man cutting the red tape that tiies him.

On stupid rules and quick wins

Why every boss can benefit from asking employees what most infuriates them


TikTok wants Western consumers to shop like the Chinese

It still has some convincing to do

Will the trouble ever end for Volkswagen and its rivals?

From strikes to Trump tariffs, calamities abound

After Northvolt’s failure, who will make Europe’s EV batteries?

The continent looks ever more reliant on Asian producers